Our Major Projects
Some of the major projects which have been/will be completed by Ley Choon are set out below:
Project Description Customer Year of Completion / Expected Completion
Maintenance and Installation of Traffic Signal System for a Period of Five Years in the West Division of Singapore LTA 2010
Proposed Improvement and Resurfacing Works to Parallel and Runway Entry Taxiways at Singapore Changi Airport CAG 2010
Proposed Water Pipelines from Punggol – Serangoon Pumping Station to Seletar Expressway PUB 2010
NEWater Infrastructure Plan Contract 04 – Laying of a 2200 mm Diameter NEWater Pipeline from Kranji Expressway to Ulu Pandan NEWater Factory PUB 2011
NEWater Infrastructure Plan Contract 02A – Laying of 2200 mm Diameter NEWater Pipeline from Pan Island Expressway to Jalan Buroh PUB 2011
Term Contract for High Pressure Gas Pipeline Project Work PowerGas 2011
Construction of East (South) Aircraft Parking Apron Associated Taxiways and Ancillary Works at Seletar Airport CAG 2012
Planned Maintenance of Roads, Road Related Facilities and Road Structures in West Sector (awarded to Ley Choon Constructions and Engineering Pte Ltd/Gim Tian Civil Engineering Pte Ltd Joint Venture, a partnership set up in July 2010) LTA 2013
Planned Maintenance of Expressways, Road Related Facilities and Road Structures LTA 2013
NEWater Infrastructure Plan Extensive (NIPE) – NIPE Contract C6 – Supply, Delivery and Laying of 2200 mm Diamater NEWater Pipeline along Pioneer Road from Shipyard Road to Sungei Lanchar Drainage Reserve PUB 2013
NEWater Infrastructure Plan Extensive (NIPE) – NIPE Contract C5 – Supply, Delivery and Laying of 2200 mm Diameter NEWater Pipeline along Pioneer Road from Gul Road to Shipyard Road PUB 2013
NIPE Contract C4 – Design and Construction of 6M Diameter Segmental Tunnel with Twin 2200 mm and Twin 1200mm Diameter Pipelines from Jurong Island to Gul Road/ Pioneer Road Junction Penta-Ocean Construction Co, Ltd. 2014
Resurfacing of Taxiways at Singapore Changi Airport CAG 2014
Design and construction of sewer diversion works LTA 2014
Supply and installation of water service connections and replacement of watermains and network enhancement projects PUB 2014
Aircraft parking stands rehabilitation works at Singapore Changi Airport CAG 2014
Maintenance of expressways, road related facilities and road structures LTA 2015
Laying and commissioning of high pressure gas transmission pipelines PowerGas 2015
Sri Lanka Rehabilitation of Selected 10 Kilometres of Sewer Lines and Condition Assessment of 125 Kilometres of Sewer Lines Ministry of Local Government and Provincial Councils 2016
Proposed Development of Taxiways, Aircraft Parking Stands and other Associated Works at Former South End Reservoir Site
Subcontract for Supply and Laying of Flexible Pavements and Cement Treated Base
Hock Lian Seng Infrastructure Pte Ltd 2018
Laying of Gas Transmission Pipeline from Woodlands Avenue 10 to Senoko Road (TL4.4) PowerGas 2016
Supply and Installation of 66kV Power Cables, Auxiliary Cables and Accessories (NDC145) PGRID 2015
Supply, Laying and Installation of Water Pipeline from Jalan Kampong Chantek to Durearn Road PUB 2017
Resurfacing of Taxiways at Singapore Changi Airport CAG 2017

Note:

(1) The actual revenue recognised in respect of the contracts and the resulting variation orders may vary from the contract sums as stated in the letters of award due to customers’ requirements subsequent to the award of the contracts.